Showing posts with label plaster. Show all posts
Showing posts with label plaster. Show all posts

Sunday, May 17, 2009

Ready Set...... Paint

An early morning Saturday visit and lucky for me a tradie was working, in fact the tradie was C our painter. C was a good bloke and gave me lots of info, like how long before I will need to repaint exterior woodwork and gutters etc. He also said that all the scribble I saw last time was put there by V our SS and he was surprised that the plasterers actually did came back and fixed everything up. He said overall the plaster work in our house is pretty good and we are lucky as he has been seeing lots of shoddy work of late.

Anyway enough gas bagging and on with the photos:

Our front door has been stained but it is still waiting on the Tri-Loc door handle and C to put on the vanish.

Not so clear but you can make out the name Flokati which will be all over the place. All walls and interior woodwork will be in Flokati so I hope we like it.


C would have had to get all the internal doors off that were hung so he can paint them. Here they have had the under coat done and will be finished in Flokati Gloss.



The House is looking better with every drop of paint. C was spraying the roof when I was in.


Good thing I got in while C was there 'cos I wouldn't have been able to see much as all the windows are covered in plastic.


I could have stayed at the house all day but I was probably holding C up a little as we were chatting.


More work has been done on the showers awaiting the tiler to begin.


Now that I am looking at this photo it seems to me that these taps are not centered. Dose not leave much room for the vertical feature tile which is meant to be on the right of the taps.


All covered up!


And our tiles have been delivered.

C said with any luck he should be finished on Wednesday. Tiling should being straight afterwards on the Thursday. So as we are only getting the bathrooms and Laundry Tiled maybe it could be all done by my next visit. (knock on wood)

Talking about next visit, I have requested a walk through with V since we got our fixing invoice and now we are on the hoe run I need him to put my mind at ease. I need to know that every issue we have raised is being taken care of and that all the smaller ones are in his radar well before we have PCI.

On that note I might have to start thinking about packing........Oh its getting close I can almost smell the finish line.

Cheers for now

Cozmo

Monday, April 20, 2009

Locked up, Plaster and more bricks

Work at the house is going at a frantic pace, As I visited last weekend I was expecting to see just a bit more of the bricks done, so it was a shock to be locked out and see all the plaster up inside.
So as usual here is a whole lot of photos:


The sky is dark and ominous but DAM it makes the bricks look good. Very happy with the brick work so far. :)


Garage all plastered up.


Bricking has began on the left side of the house. It does look like we will have a fair few bricks left over. I'm not sure if I want to keep any left over bricks, after speaking with our SS today he said if we want to keep them we need to stack them at the back of the house, probably a job for this weekend as he said the bricks should be finished by the end of week.



As I was locked out all the inside shots have been taken though the windows so might not be really clear. This one is of the toilet...cos I know you wanted to see that!



The main bathroom. This blue plaster board is used in the wet ares, so I guess it must be water resistant.


Bedroom 3. Wardrobe on the right and hallway straight ahead.


Bedroom 4.


Looking from the window at the rear of the house into the rumpus. Void on the left, we hope to put a plantation shutter in this (Just like the display!).


Oh the rumpus again, you can really tell I like this room.



This will be our Kitchen. The Blue bit is were the fridge will go, with oven and cook top on the wall next to it.


Bricking in the Alfresco is complete apart from the pillars. This is also the first window the has had bricks put in underneath.


Courtyard with our NQR french door. Our SS said this will be fixed nearer to completion as many of the doors will need some form of adjustment.



Family Room. TV and stereo will go on this wall.



Another picture of the bricks. One thing to do if your selecting bricks for your new house is to go the manufacturers website and see what finish for the mortar they recommend with your bricks. It was recommended for a racked or rolled finish for ours, so we went with the rolled as we had paid for the upgrade to off white mortar. I think we have got it right as the mortar clearly defined without overpowering the colours of the bricks.


Master bedroom, looking at the walk in robe.

So whats next: Bricks finished by the end of the week (and probably a big fat invoice from porter), Fixing Carpenter starts next week and painting to begin in two weeks time. At this rate we should looking for a handover date in the next school holidays, which will make a nice and easy transition for Master C into his new school. (knock on wood).

Cheers Cozmo