Showing posts with label taps. Show all posts
Showing posts with label taps. Show all posts

Sunday, July 12, 2009

Flooring Photo Fest!

PCI is this week and the final touches on the house are being applied.
The remaining tap fittings have being installed.



WIR...... Surly the other half could let me have more than the 1/2 a meter of closet space I'm allowed in the rental with all this space.............. No I've just being informed that she needs all of it and I can have 1/4 of a meter.



Master



The Lounge



Bedroom 2.



Bedroom 3 soon to be home of the Master of the house.

Bedroom 4 which will be my little den when working from home.



Its a Hallway!



OK now we get to the bit that really excited me when I saw the house this week and that was the fact that our Trueloc Flooring had being laid( well 99.9% anyway). We choose spotted gum and I think its looks $h!t Hot!!!



Entry with the 0.1% that needs to be finished.



Looking at the living room.





Rumpus.




From Living Room to the kitchen.




Rumpus to front door.


And a better picture of the splash back with the correct pot draws.
PCI is this Thursday..................... I don't think there will be much to pick on.... just a few paint touch ups and maybe just some other minor things.... all I can say is that the work being done on our house has being of a very high quality.
I am glad I have seen the house with the floor now before PCI so I wont just walk around with my gob open drooling like I did when I took these photos so I can concentrate and find all those little faults.
Wish me Luck
Cheers
Cozmo














Tuesday, May 26, 2009

The Great Whiteout! - Painting photofest

We had a meeting with out SS V on Monday. He talked us through all the next steps to be undertaken and answered any questions we had( which there were many). We left the house feeling that our house is in very capable hands and that all our issues will be addressed.( Most of these are very minor).
The front render has had its first coat of surfmist applied and moldings put onto the front windows. Gutters and fascia have also had one cost of ironstone put onto them, with another to go.


All internal doors painted in Gloss Flokati... nice and shiny!

Kitchen and Dining, SS said the replacement pot draws have been ordered and the exposed end will be covered in vinyl wrap.


Bedroom 2



Laundry. Tiles will cover where it is not painted.




The abyss



Bedroom 3




Bedroom 4 or study.



Bedroom hallway looking down towards bedroom 4.



Looking through void in rumpus.



Rumpus looking down to front door..... it seems so far away




Opposite view... from front door to rumpus..... there is light at the end of the tunnel!





Master bedroom.



More Master bedroom!




Up close and personal with the front door. Now with vanish.



Looking from dining to bedroom hallway.



Family room.




From down the street .



Closer look at the gutters and half painted beam.



Just love the front door!



Actually love the house full stop!
Now there will be no work at the house for the next few days as we are waiting for the tilers to begin, he has another house to finish and is expected at our house by Friday.
Tiling should take a week at most and then the final fit off can start... shower screens, tap ware and sparkies.
SS says barring any disasters we should have PCI in 4-5 weeks. So time to get some driveway/fencing quotes.

I know allot of people stop blogging about there build in the final weeks as it all gets very busy with packing/moving getting quotes etc. but I will try to keep the updates coming so you can get the complete picture of the build.
Cheers for now
Cozmo

Monday, December 1, 2008

Contract signed

A well over due update:

We had our tender appointment three weeks ago and luckily our site costs came in well under the 9k we had budgeted for at just over 5k. sweet

As we had saved a little on the sites costs we decided to spend the money on some more pot draws in the kitchen and a few more power points( We probably would have added these anyway but it felt good adding them in and still coming in under budget)

On Wednesday we had our contract appointment and all went very well except we had to add another $1200 to the house due to increasing the ceiling bats from R2.5 to R3.5 to meet 5 star energy requirements and we also increased the size of the kick boards for the bathroom and ensuite vanities from 703mm to 803mm. The standard height is 900mm but PD make them lower when you select the fish bowl above counter type sinks. While we think 900mm would be to high as the taps would be at chest level, a 200mm reduction was to much and would be unpractical (especially when T has a makeup and hair marathon before we go out).

At the end that cost us $74.

Today we received a phone call from our CSC and she told us that we had received developer approval on our plans and colours.

So all that needs to happen now is for a the bank to come to the party and formally approve the loan and we can sign our next 20-30years away.

I will post plans of the house soon.